7E: Difference between revisions

From National Optronics resources center
Jump to navigationJump to search
Line 39: Line 39:
*[http://nationaloptronics.net/download/7E/procedure/Good_7E_HLP_Polishing_Settings_Material_Screen_2.doc Good Settings for 7E HLP polishing Material Screen 2]
*[http://nationaloptronics.net/download/7E/procedure/Good_7E_HLP_Polishing_Settings_Material_Screen_2.doc Good Settings for 7E HLP polishing Material Screen 2]


*[http://nationaloptronics.net/download/7E/procedure/11190539.pdf Replacement of the Clamp Arm and Lead Screw Assembly 3/16 inch Shoulder Screw]
*[http://nationaloptronics.net/download/7E/procedure/11190539.pdf Replacement of the Clamp Arm and Lead Screw Assembly 3/16 inch Shoulder Screw (kit is part no. 90539)]


=Software=
=Software=

Revision as of 19:58, 24 January 2012

Documentation

Specials instructions for USB card cage

  • How to update a 7E floppy disk card cage to a 7E USB card cage (download)
  • How to use the 7E USB installer (download)

Manuals






Procedure Documents

Software

Instructions

Execute the download program on a PC to create an update USB thumb drive or a floppy disk for the 7E edger.

Version 1.29

New features
  • Add job screen options for Chemistrie frames (requested by Eyenovate).
Bugs fixed
  • FCRV does not download properly for the left eye.
  • Multi-cutter collision avoidance is not correct when 5 degree taper cutter is installed.
  • Axis burn-in graph indicates false errors.
Download